top of page

Norman Glavas Architects Manhasset

Archangel Michael

 

 

 

 

 

 

Congregational Church

 

Easter 2017 Mass

Easter 2017 Mass

panoramic image from mezzanine of Archangel Michael's Church

Before

Before

Before

Before

Before

Before

 

This project was initiated and completed in collaboration with N2Design + Architecture P.C.

 

Nine years in construction, 50,000 s.f. of space that is totally ADA accessible with 175 parking spaces and a construction cost of $15 million offers the following:

 

  • Main Church seating for 500 parishioners

  • Attached Chapel seating for 75 parishioners

  • 16 Classrooms with capacity of 30 children per classroom

  • Fellowship hall

  • Full sized commercial kitchen

  • Administrative offices

  • Regulation High School sized Gymnasium

  • Bell Tower with connecting collonade

Norman A. Glavas Architects / t: 516.365.5111 / f: 516.365.5197 / office@nglavas.com

Manhasset, NY

Redesign of existing 55 foot high steeple to accommodate 4 telecommunication cell providers blending technology and aesthetics.

 

Additional work included:

  • Addition of new Choir Rehersal area

  • Redesign of Front Elevation

  • Addition of ADA elevator

  • New exterior signage

  • New side entrance

Greek Orthodox Chuch

 

Port Washington, NY

RELIGIOUS

360-Degree Virtual Tour of Archangel Michael Church

 

 

Click here  to check it out.

 

Check out a 360-degree virtual tour of our recent project on the Archangel Michael Greek Orthodox Church. You can view seven unique panoramas of the entire campus by clicking on the thumbnail images on the left side.  You can even look up, down, left or right, by clicking and dragging with your mouse or trackpad.

 

 

Pano-tours by chrisbain.com

bottom of page